Cooking, Renovations and Fun Stuff

Monday, April 15, 2013

Bathroom Renovation – Day 16

Another busy day in the bathroom. The electrician came first thing to do his final fit off. He put the light fitting back in and put in a new light switch and also finished off the power points. The new extractor fan was also put in (ducted through the outside wall of the second storey, since the eaves outside the bathroom on the ground floor are asbestos).

Next up was the plumber. He installed the toilet, put in the bath mixer and bath spout, the shower mixer and shower head, and the basin and tap. Can’t use anything yet though as silicone still needs to be applied to the tiled areas.

No comments: